|
Flood
Investigations
Problem:
In connection with its design of bridge openings the cooperator requires information regarding the hydrologic and hydraulic characteristics of specific reaches of streams.
Approach: Operate crest-stage gages at 44 sites. Make indirect measurements of peak flow as unusual floods occur. Publish peak-flow data in the annual data report and enter into the Peak Flow File of the NWIS System. Prepare special reports as required for unusual flood events. |
Virginia Projects or: Water Resources of Virginia |
Contact: GS-W-VArmd_webmaster@usgs.gov |
U.S. Department
of Interior, U.S. Geological Survey Privacy Statement Disclaimer Accessibility |
URL: https://va.water.usgs.gov/projects/flood_investigations.html |
Last modified: Tuesday, July 26, 2005 09:53:14 AM