|
Study area
| Project |
|
Title:
Blue Ridge Parkway Landfill Seepage
Number:
VA128
Location:
Near Roanoke
Cooperating Agencies:
National Park Service
Project Chief:
Donna Belval
Period of Project:
????
|
|
|
|
Blue
Ridge Parkway Landfill Seepage
Location of project
|
Problem
An
unnamed stream that runs through National Park Service (NPS) land at the Blue
Ridge Parkway, VA originates at the base of an abandoned landfill.
Based on physical conditions at the stream and the lack of biologic
diversity in the stream, an outflow pipe from the landfill is suspected of being
a source of leachate from the landfill to the stream.
NPS would like to know more about the chemical and biologic conditions of
the stream, and whether this stream may have an adverse effect on other water
bodies.
Objective
To determine whether leachate from the landfill
is being discharged to the stream, and if so, whether potentially harmful
chemicals have been or are being released into the stream from the landfill.
Relevance and Benefits
This
project furnishes hydrologic data that contributes to the protection of life and
property by assessing the potential impacts on the aquatic biota in streams on
National Park lands, and possible parallel impacts on the Roanoke River.
Approach
Water
samples and sediment samples will be collected in the stream near the landfill,
and at several points between the landfill and the Roanoke River, approximately
1/2 mile away. Samples will be
analyzed for a broad range of inorganic and organic constituents, including
pesticides and PCB's. At the same
sites, species diversity will be determined, and water samples will be collected
to test toxicity. Analytical
methods used will be EPA-approved methods, and chain-of-custody procedures will
be followed. Samples will be
collected once at high baseflow (February-March) and once at low baseflow
(July-August).
|